Define the housing, cover, duct, filter element or complete assembly you need. We review the supply boundary, interfaces, construction and validation requirements for the application.

What we can support

Plan the moulded parts, assembly and performance requirements together.

Housing geometry, interfaces, filter media, assembly controls and performance testing are considered together.

Published Premier air-cleaner assembly from the component portfolio.
Air-cleaner assembly from the component portfolio.
01

System

Moulded components

Define the housings, covers, ducts, seals and bought-in items included in the quotation. An individual component and a complete assembly have different supply boundaries.

Read the air-cleaner assembly guide
Hot-plate welding equipment used for controlled component joining.
Controlled joining and assembly operations complete moulded filtration parts.
02

Assembly

Assembly and checks

Screwing stations, Poka Yoke and online leak checks control repeatable assembly output.

Review assembly
03

Validation

Performance testing

Agree applicable restriction, filtration, sealing and other tests for the actual construction. Results must identify the sample, conditions and acceptance criteria; no universal rating is implied.

Review validation

How the work moves

A filtration system developed from housing geometry to measured performance.

  1. 01

    System requirements

    Confirm installation space, airflow, filtration, interfaces and the required checks.

    Review components
  2. 02

    Housing and tooling

    Develop housing, cover, duct and sealing interfaces for moulding.

    Review tooling
  3. 03

    Moulding

    Produce housings, covers, ducts and related interfaces within the approved process settings.

    Review injection moulding
  4. 04

    Filter and assembly operations

    Complete filter fitment, joining and fastening as required by the system design.

    Review assembly
  5. 05

    In-line checks

    Apply mistake-proofing and applicable leak or sequence checks before testing.

  6. 06

    Performance validation

    Run the applicable restriction, dust-efficiency or programme-specific tests.

    Review validation

Discuss your requirements

Checks before filtration-system production.

Air Cleaner Systems programme gates
StageReview focusExpected output
System requirementsInstallation space, airflow, filtration requirements, interfaces and component-versus-assembly supply boundaryDefined system brief
Housing and toolingHousing, cover, duct and sealing interfacesHousing and interface design suitable for manufacture
Moulding and assemblyComponent production, filter fitment and controlled joiningCompleted filtration system
Performance validationApplicable assembly, restriction and filtration checks with agreed conditions and acceptance limitsInspection and approval records

Talk to our team

Tell us about the part.

Send the drawing, installation interfaces, bill of materials, element construction, demand and required test specification. Identify supplied or bought-in items and the operations included in the enquiry.

Send an enquiry