Air Cleaner Systems
Air-cleaner components and assemblies, from definition to validation.
Define the housing, cover, duct, filter element or complete assembly you need. We review the supply boundary, interfaces, construction and validation requirements for the application.
What we can support
Plan the moulded parts, assembly and performance requirements together.
Housing geometry, interfaces, filter media, assembly controls and performance testing are considered together.

System
Moulded components
Define the housings, covers, ducts, seals and bought-in items included in the quotation. An individual component and a complete assembly have different supply boundaries.
Read the air-cleaner assembly guide
Assembly
Assembly and checks
Screwing stations, Poka Yoke and online leak checks control repeatable assembly output.
Review assemblyValidation
Performance testing
Agree applicable restriction, filtration, sealing and other tests for the actual construction. Results must identify the sample, conditions and acceptance criteria; no universal rating is implied.
Review validationHow the work moves
A filtration system developed from housing geometry to measured performance.
- 01
System requirements
Confirm installation space, airflow, filtration, interfaces and the required checks.
Review components - 02
Housing and tooling
Develop housing, cover, duct and sealing interfaces for moulding.
Review tooling - 03
Moulding
Produce housings, covers, ducts and related interfaces within the approved process settings.
Review injection moulding - 04
Filter and assembly operations
Complete filter fitment, joining and fastening as required by the system design.
Review assembly - 05
In-line checks
Apply mistake-proofing and applicable leak or sequence checks before testing.
- 06
Performance validation
Run the applicable restriction, dust-efficiency or programme-specific tests.
Review validation
Discuss your requirements
Checks before filtration-system production.
| Stage | Review focus | Expected output |
|---|---|---|
| System requirements | Installation space, airflow, filtration requirements, interfaces and component-versus-assembly supply boundary | Defined system brief |
| Housing and tooling | Housing, cover, duct and sealing interfaces | Housing and interface design suitable for manufacture |
| Moulding and assembly | Component production, filter fitment and controlled joining | Completed filtration system |
| Performance validation | Applicable assembly, restriction and filtration checks with agreed conditions and acceptance limits | Inspection and approval records |
Talk to our team
Tell us about the part.
Send the drawing, installation interfaces, bill of materials, element construction, demand and required test specification. Identify supplied or bought-in items and the operations included in the enquiry.


