Quality and Validation
Measure the part. Check the process. Approve the result.
Critical dimensions, production conditions and agreed functional checks are reviewed before parts are approved for supply.
Inspection plan
Define the checks before production begins.
- 01
Plan the checks
Define critical dimensions, process results and required functional tests.
Discuss validation - 02
Measure
Record dimensions and process results against the agreed requirements.
- 03
Test
Run the agreed functional checks.
- 04
Review and approve
Review results and exceptions before parts are approved for supply.
Discuss the requirement
Management-system certificates
Published management-system certificates and their scope.
Certificate records show the available standard, entity, site, scope and validity details, with the original document.

Quality
ISO 9001 certificate
Issued to Premier Plasmotec Private Limited for Plot 1100, Sector 58, Faridabad/Ballabhgarh. Check the linked document’s scope and validity dates.

Automotive
IATF 16949 certificate
Issued to Premier Indoplast Pvt. Ltd. for Plot 41, Sector 4, Faridabad. Product design is excluded; request the referenced appendix when checking scope.

Environment
ISO 14001 certificate
Issued to Premier Indoplast Pvt. Ltd. for Plots 27–28, Sector 59, Faridabad. Check the linked document’s scope and validity dates.

Safety
ISO 45001 certificate
Issued to Premier Indoplast Pvt. Ltd. for Plots 27–28, Sector 59, Faridabad. Check the linked document’s scope and validity dates.
Inspection equipment
Equipment used to measure and test parts.

Coordinate measuring machine
- Equipment type
- CMM
- Use or function
- Dimensional measurement of component and tooling geometry
- Source
- August 2025 corporate presentation
CMM inspection measures critical dimensions and supports mould corrections.

Industrial 3D scanner
- Equipment type
- Optical geometry capture
- Use or function
- Comparison across the scanned surface and support for reverse engineering
- Source
- August 2025 corporate presentation
3D scans provide digital geometry for comparison with the part design.

Profile projector
- Equipment type
- Optical profile inspection
- Use or function
- Profile, edge and feature measurement
- Source
- August 2025 corporate presentation
Optical inspection supports detailed profile and feature checks.

Air-filter performance test rig
- Equipment type
- Functional test system
- Use or function
- Programme-specific air-filter performance validation
- Source
- August 2025 corporate presentation
The rig tests air-filter performance against the agreed requirements.
Production checks
Quality checks continue during production.
Mistake-proofing, joining controls and functional checks help keep production consistent.
Mistake-proofing
Poka-yoke (mistake-proofing)
Fixtures and sequence controls help prevent incorrect assembly.
In-line control
Leak testing
In-line leak tests check for leaks before supply.
Joining
Welding control
Defined joining settings and inspection checks support repeatable welds.
Approval checks
What is checked before approval.
| Step | Focus | Evidence |
|---|---|---|
| Plan | Critical dimensions and functional test requirements | Validation plan |
| Measure | Dimensional and process results | Inspection records |
| Test | Programme-specific function | Controlled test results |
| Review | Exceptions and release decision | Approval record |
Start a project
Tell us what you need to make.
Describe the part, material if known, expected volume, current tooling and target timing. Ask the team how to share drawings or confidential files. We will connect you with the relevant engineering, tooling, manufacturing or quality team.