Quality and Validation

Measure the part. Check the process. Approve the result.

Critical dimensions, production conditions and agreed functional checks are reviewed before parts are approved for supply.

Inspection plan

Define the checks before production begins.

Industrial 3D scanner used for geometry capture and comparison.
Geometry capture supports the validation plan and comparison strategy.
  1. 01
    Industrial 3D scanner used for geometry capture and comparison.
    Geometry capture supports the validation plan and comparison strategy.

    Plan the checks

    Define critical dimensions, process results and required functional tests.

    Discuss validation
  2. 02
    Coordinate measuring machine used for dimensional inspection.
    Dimensional measurement supplies controlled evidence for review.

    Measure

    Record dimensions and process results against the agreed requirement.

  3. 03
    Air-filter performance test rig used for programme-specific validation.
    Functional testing links component design to measured performance evidence.

    Test

    Run the agreed functional checks.

  4. 04
    Optical profile projector used to inspect detailed component features.
    Inspection records and exception review complete the release evidence.

    Review and approve

    Review results and exceptions before parts are approved for supply.

    Discuss the requirement

Quality certifications

Quality-system certificates and their stated scope.

Open the published evidence to review the legal entity, site, scope and validity shown on each certificate.

Production checks

Quality checks continue during production.

Mistake-proofing, joining controls and functional checks help keep production consistent.

01

Mistake Proofing

Poka Yoke

Fixtures and sequence controls help prevent incorrect assembly.

02

Online Control

Leak testing

In-line checks identify pressure-integrity failures before supply.

03

Joining

Welding control

Defined joining settings and inspection checks support repeatable welds.

Approval checks

What is checked before approval.

Validation sequence
StepFocusEvidence
PlanCritical characteristics and test intentValidation plan
MeasureDimensional and process resultsInspection records
TestProgramme-specific functionControlled test results
ReviewExceptions and release decisionApproval record

Start a project

Tell us what you need to make.

Share the part or drawing, material if known, expected volume, current tooling and target timing. We will connect you with the relevant engineering, tooling, manufacturing or quality team.

Start an enquiry